Skip to main content

Energy consumption

Energy consumption

The energy audit process was launched at the plants of the Aerostructures division to analyze all possible improvements and incorporate them into the Company’s energy efficiency plan.

The energy audit process was launched at the plants of the Aerostructures division to analyze all possible improvements and incorporate them into the Company’s energy efficiency plan.

Understanding the Company’s efficiency in energy consumption is a priority, not only from an environmental point of view, but also in economic terms.

Energy consumption

2023

2024

2025
SPAIN

2025
BRAZIL

2025
FRANCE

2025
MOROCCO

2025
TOTAL41

ELECTRICITY (kWh)
51,156,94942
53,402,791
43,921,50843
3,471,49344
6,156,43345
1,161,000
54,621,050
GENERATED ELECTRICITY (kWh)46
3,310,483
3,204,588
3,272,648
0
0
0
3,272,648
GAS47 (kWh)
14,873,44348
15,630,130
14,689,556
155,977
116,843
0
14,962,376
DIESEL (l)
54,557
54,123
51,383
0
0
0
51,383
TOTAL (GJ)49
239,661
262,007
228,138
13,059
22,584
3,858
267,638
ENERGY INTENSITY RATIO (GJ/k€)50
0.54
0.53
-
-
-
-
0.47

41. The data presented in this table and in the following tables in this “Environmental management” section, unless otherwise indicated, for 2025, in the case of Spain, take into account Aciturri Aeronáutica, S.L.U., Aciturri Aerostructures, S.L.U., Aciturri Engineering, S.L.U., Aciturri Corporate, S.L.U. and Alestis Aerospace S.L.U. for the full year, and include the data for Aciturri Aeroengines, S.L.U. for the first 9 months. In the case of Brazil, with Alestis do Brasil Industria Aeroespacial, Ltda., the full fiscal year will be considered. In the specific case of Malichaud Atlantique, S.A.S. in France and GOAM Industrie S.A.R.L. in Morocco, only the period from 1 January to 30 September 2025 will be taken into account.

During 2025, and within the framework of the actions arising from the decarbonization plan, several measures were carried out to promote process efficiency and improve energy management. For example, fixed-output compressors were replaced with variable-output compressors at the Aerópolis, Mairena and Getafe plants, resulting in energy savings.

At the end of the year, the energy audit process was launched at the plants of the Aerostructures division to analyze all possible improvements and incorporate them into the Company’s energy efficiency plan.

About renewable energy consumption, at the end of 2025 work began on the installation of a new solar panel plant at the Puerto Real plant.