Waste
Waste

Aciturri manages the waste generated at its plants through segregation at source and subsequent delivery to authorized managers so that they can carry out the most appropriate and specific treatment, prioritizing reuse, recycling or recovery over other actions such as final disposal in landfill.
Aciturri manages the waste generated at its plants through segregation at source and subsequent delivery to authorized managers so that they can carry out the most appropriate and specific treatment, prioritizing reuse, recycling or recovery over other actions such as final disposal in landfill.
Generated waste
DANGEROUS WASTE | 2023 | 2024 | 2025 | 2025 | 2025 | 2025 | 2025 | TOTAL |
|---|---|---|---|---|---|---|---|---|
DANGEROUS WASTE (Kg) |
1,639,105
|
1,526,816
|
723,774
|
11,890
|
94,642
|
634,928
|
63,893
|
1,529,127
|
|
REUSE
|
25,359
|
54
|
8,469
|
0
|
0
|
0
|
0
|
8,469
|
|
RECYCLING
|
32,733
|
6,188
|
3,449
|
0
|
532
|
472
|
0
|
4,453
|
|
OTHER RECOVERY OPERATIONS
|
100,009
|
203,220
|
244,159
|
0
|
12,313
|
0
|
0
|
256,472
|
|
INCINERATION WITH ENERGY RECOVERY
|
801,732
|
760,052
|
0
|
0
|
0
|
568,124
|
0
|
568,124
|
|
INCINERATION WITHOUT ENERGY RECOVERY
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
|
LANDFILL
|
220,776
|
117,170
|
1,399
|
11,890
|
0
|
66,332
|
63,893
|
143,514,000
|
|
OTHER DISPOSAL OPERATIONS
|
458,497
|
435,904
|
466,299
|
0
|
81,797
|
0
|
0
|
548,096
|
59. The data presented for 2025, in the case of Spain, consider Aciturri Aeronáutica, S.L.U., Aciturri Aerostructures, S.L.U., Aciturri Engineering, S.L.U., Aciturri Corporate, S.L.U. and Alestis Aerospace S.L. for the full year, as well as, in the case of Brazil, Alestis do Brasil Industria Aeroespacial, Ltda. In the specific case of Aciturri Aeroengines, S.L.U. in Spain, Malichaud Atlantique, S.A.S. in France and GOAM Industrie S.A.R.L. in Morocco, only the period from 1 January to 30 September 2025 will be considered.
Generated waste
NON- DANGEROUS WASTE | 2023 | 2024 | 2025 | 2025 | 2025 | 2025 | 2025 | TOTAL |
|---|---|---|---|---|---|---|---|---|
NON-HAZARDOUS WASTE (T) |
2,041,619
|
1,896,318
|
1,915,541
|
174,540
|
267,252
|
75,750
|
O
|
2,433,082,600
|
|
REUSE
|
83,470
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
|
RECYCLING
|
1,250,866
|
1,315,072
|
1,317,937
|
37,160
|
244,032
|
54,750
|
0
|
1,653,878,600
|
|
OTHER RECOVERY OPERATIONS
|
0
|
171,894
|
410,236
|
0
|
23,220
|
0
|
0
|
433,456,000
|
|
INCINERATION WITH ENERGY RECOVERY
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
|
INCINERATION WITHOUT ENERGY RECOVERY
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
0
|
|
LANDFILL
|
707,282
|
409,350
|
187,368
|
137,380
|
0
|
21,000
|
0
|
345,748,000
|
|
OTHER DISPOSAL OPERATIONS
|
0
|
1
|
0
|
0
|
0
|
0
|
0
|
0
|
59. The data presented for 2025, in the case of Spain, consider Aciturri Aeronáutica, S.L.U., Aciturri Aerostructures, S.L.U., Aciturri Engineering, S.L.U., Aciturri Corporate, S.L.U. and Alestis Aerospace S.L. for the full year, as well as, in the case of Brazil, Alestis do Brasil Industria Aeroespacial, Ltda. In the specific case of Aciturri Aeroengines, S.L.U. in Spain, Malichaud Atlantique, S.A.S. in France and GOAM Industrie S.A.R.L. in Morocco, only the period from 1 January to 30 September 2025 will be considered.
During this year, at the Orón plant, the agreement with RWC Recycling for the management of sludge waste recycling continued.
In addition, in 2025, several improvement actions were carried out at plants located in Spain, with the aim of reducing hazardous and non-hazardous waste. Specifically, at Seville Airport, all plastics from the so-called LAR clean room were managed separately. Improvements have also been implemented in relation to the returnability and reuse of packaging.
No food waste is generated, and therefore there are no initiatives for its prevention and minimization.